Tuesday, February 07, 2012
   
Text Size

Change of soil

 

Change of soil

Change of soil is recommended in case of the small volume/thickness of already weakened substrate and when there is an excessive weight emphasis on the ground. In order to assess how much work needs to be done, drilling as close as possible to (bearing walls) needs to happen. Drilling enables to asses how much soil needs to be taken out and the range of soil underneath the building. On the basis of these examinations, the outside and inside foundation needs to be uncovered. On the side, where the work needs to be done, the soil has to be removed as far as possible to give enough space to reach the building foundation.

Gardening - Change of Soil

Online Now

We have 8 guests online

how did u hear about us

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday61
mod_vvisit_counterYesterday49
mod_vvisit_counterThis week159
mod_vvisit_counterLast week328
mod_vvisit_counterThis month324
mod_vvisit_counterLast month323
mod_vvisit_counterAll days78027

Online (20 minutes ago): 12
Your IP: 38.107.179.239
,
Today: Feb 07, 2012

Login